1. Slowly complete activated sludge replacement before late autumn and early winter.
Generally speaking, microorganisms gradually adapt to the ambient temperature during their growth and metabolism, but this adaptation process often takes a long time.
Some wastewater treatment plants begin slowly replacing activated sludge as temperatures begin to drop in autumn, steadily improving microbial adaptability to colder temperatures.
This operation is best completed in late autumn and early winter, gradually increasing the sludge concentration until it reaches the activated sludge concentration required for winter operation, ensuring stable operation of the biochemical treatment process.
2. Install ventilation fans on the roof of the mechanical screen room.
In addition to low temperatures, winter is also characterized by high humidity and moisture. Because of this, ice often forms on the limit switches of the mechanical screens, causing water blockage and leaks, leading to operational problems.
Some sewage treatment plants, taking this into consideration, have chosen to install ventilation fans on the roof structure of the building. They use corrosion-resistant materials such as stainless steel for the screen control cabinet. This ensures natural moisture dissipation and proper ventilation while also keeping the screen room temperature from dropping too low, preventing corrosion of the control cabinet from the cold and humidity. This also minimizes the risk of icing on the limit switches and ensures proper operation of the mechanical screens.
3. Install insulation covers/boards above the tank or add heating facilities.
The forced aeration in the aeration tank dissipates a small amount of heat from the sewage, lowering the water temperature and affecting treatment efficiency. Therefore, the above-ground walls of the aeration tank should be covered with foam insulation panels and brickwork as a protective structure to insulate the tank. In addition, solar panels, plastic sheets supported by stainless steel, or thermal blankets should be installed above the sludge and thickening tanks to trap heat during daytime sunlight and ensure the tank temperature remains above 0°C.
Some wastewater treatment plants also choose to embed a heating pipe within the tank, using hot water generated by a boiler or cogeneration, or use air heaters to evenly heat the entire tank through aerators.
4. Increase pipeline insulation thickness or install heat tracing pipes.
Unused pipelines must be drained before winter. Sewer lines and scum pits should be thoroughly cleared and cleaned before winter. All other pipelines should also be protected from freezing.
For example, exposed pipelines should be wrapped with insulation wool or felt, while pipelines that intermittently transport liquids should be wrapped with heat tracing tape.
Valves should also be carefully inspected before winter to ensure they are leak-proof. Place straw mats in the valve pits to insulate them.

5. Install shaftless screw conveyors instead of traditional sludge hoppers.
During low winter temperatures, sewage and sludge often freeze in the sludge hoppers, causing serious blockage and reducing the number and activity of microorganisms in the sludge.
To address this issue, some sewage treatment plants have removed their existing sludge hoppers and installed four shaftless screw conveyors at the sludge outlet. These mechanized shaftless screw conveyors prevent sludge and sewage from freezing and clogging due to exposure to cold air. It is understood that this plant has not experienced sludge outlet blockage for several consecutive winters.
6. Install induced draft fans in the dewatering room.
Insulation and anti-freeze measures are crucial during the sludge disposal process. When temperatures are low, sludge cakes can freeze in the dewatering room. Furthermore, toxic and harmful gases in the sludge cannot evaporate due to the low temperature, leading to high concentrations of these gases within the room and posing a safety hazard.
For this reason, some sewage treatment plants have opted to install induced draft fans in the dewatering room to effectively raise the room temperature and reduce humidity, thereby lowering the concentration of these gases.
7. Adding a Waste Heat Recovery Unit to Heat Raw Wastewater
During winter operation, wastewater treatment plants can install a waste heat recovery unit to recycle heat from tailwater for heating the raw wastewater, keeping the water temperature within a relatively high range. This also reduces the cost of additional chemical additions required due to low temperatures.
Microorganisms freeze to death, significantly reducing ammonia nitrogen removal rates. What key points should be considered during winter sewage treatment plant operations?
If the water temperature in a sewage treatment plant is low in winter, the low temperature will weaken the microbial activity in the activated sludge, which in turn can easily cause sludge bulking, resulting in reduced microbial treatment efficiency and ultimately unstable effluent quality. In practice:
When the water temperature falls below 13°C, the biological treatment effect begins to decline rapidly; when the water temperature falls below 4°C, the treatment effect is almost non-existent. When the temperature falls below 15°C, the nitrification rate decreases, completely halting at 5°C. Below 15°C, the growth rate of denitrifying bacteria decreases, and their metabolic rate also slows.
1. Control Measures for Ammonia Nitrogen in Effluent Under Low Winter Conditions
Reduce sludge discharge, appropriately increase sludge concentration and sludge age, and improve ammonia nitrogen removal capacity by replenishing the number and abundance of nitrifying bacteria. If the effluent ammonia nitrogen concentration is unstable, increase aeration to control the water temperature and increase the dissolved oxygen concentration in the biological tank to create favorable conditions for nitrification and further reduce the effluent ammonia nitrogen concentration.
2. Measures for Controlling Total Nitrogen in Effluent During Low Winter Temperatures
While ensuring ammonia nitrogen meets standards, control dissolved oxygen at the end of the biological pond below 2 mg/L to avoid damaging the anoxic zone. Sufficient carbon sources should be stored and provided, and dosage should be adjusted dynamically based on nitrate nitrogen data. For example, when the nitrate nitrogen concentration in the aerobic zone effluent rises and exceeds 13 mg/L, add chemicals; when the nitrate nitrogen concentration falls below 12 mg/L, reduce the dosage. When low temperatures lead to insufficient denitrifying bacterial activity and high effluent total nitrogen, add denitrifying bacteria to enhance denitrification.
3. Measures for Controlling Total Phosphorus in Effluent During Low Winter Temperatures
Maintain uniform sludge discharge, closely monitor the sludge concentration and settling ratio in the biological pond, and maintain stable sludge concentration fluctuations. Biological phosphorus removal efficiency decreases in winter, so the dosage of phosphorus removal chemicals should be appropriately increased. Based on online phosphate data in the secondary clarifier effluent, timely adjust the biological pond effluent point and the dosage of chemicals in the coagulation and sedimentation tank. Supplement sodium acetate upstream of the anaerobic zone to increase the carbon source required for biological phosphorus removal and enhance phosphorus removal capacity.
4. Measures for controlling suspended solids in effluent during low winter temperatures:
Maintain a low sludge level in the secondary sedimentation tank to prevent sludge runoff caused by high sludge levels. After adding phosphorus removal agents, promptly discharge chemical sludge generated in the coagulation and sedimentation tank. Closely monitor the operation of the cloth filter and the level of suspended solids in the effluent. Immediately inspect the equipment if any abnormalities are detected. Monitor sludge settling in the secondary sedimentation tank and adjust the process promptly if sludge bulking occurs.
Five common equipment management issues in low-temperature conditions: Prepare fall solutions in advance.
1. How to thaw pipelines and equipment?
1) When thawing pipelines, thaw slowly and evenly from the ends toward the center. Start by warming with a small amount of hot water, then increase the amount of hot water to prevent sudden temperature increases that could damage the pipes.
Also, take protective measures after thawing to prevent pipeline damage and other accidents.
2) When thawing equipment, start by warming with a small amount of hot water, then increase the amount of hot water. Avoid using steam directly to prevent sudden temperature increases that could damage equipment components.
If valves or other components are difficult to open or close, do not force them. Use hot water to warm them before opening to avoid damaging internal components.
In addition, outdoor slopes, stairways, corridors, platforms, and inspection paths in all processing areas, chemical dosing rooms, and laboratories should be kept clean and snow removed promptly to prevent water accumulation and ice formation.
2. How to resolve frozen water inlet screens?
When temperatures remain below 0°C in winter, ice can form on the tines of the coarse and fine screens that inlet water, reducing the spacing between the coarse screens and causing clogging of the fine screens. Countermeasures: Maintain a high water level in the screens to keep the bars submerged in water to prevent freezing.
Coarse and fine screens, screw conveyors, and presses should be opened more frequently and maintained in continuous operation when the ambient temperature remains below 0°C.
Once frozen, do not forcefully open the equipment. Apply a de-icing agent or other artificial thaw agent to the screws before restarting. Ventilate the indoor screen room to reduce humidity and prevent ice from forming on the limit switches.
3. How should pump equipment be maintained in low-temperature conditions?
When water trapped in the pump body freezes below 0°C, its volume expands, easily causing the pump body to crack.
Therefore, for standby inlet and return pumps that operate intermittently, effective antifreeze measures should be implemented. These include draining the pump body when not in use, maintaining constant water flow, adding insulation and heating, and using downhole pumps.
Submersible sewage pumps, while submerged, will not freeze, but the pipes from the pump outlet to the surface should be insulated.
4. What should I do if the sedimentation tank scraper is slipping and not scraping properly?
Replace existing nylon or steel wheels with rubber wheels or rubber tires to increase the roughness of the running wheels. Replace existing terrazzo, tile veneer, or steel rails with cement mortar to increase the friction resistance of the running wheels and increase the roughness of the walkway slabs. Install snow removal devices on the equipment.
5. What precautions should be taken when operating an MBR membrane system in low-temperature conditions?
In winter, when the MBR membrane system experiences low temperatures, a heat source should be introduced to maintain a high membrane flux and the activity of microorganisms in the mixed liquor.
It is worth noting that hollow fiber membranes made of PTFE are prone to breakage when ambient temperatures drop. Freezing and thawing during the transition from winter to spring can pose a risk of damage to the membrane structure.